Upgrading about 44 km of the E11 Road to be dual 3-lanes in both directions from Al Barakah to Al Sila’s
providing a new wider cross section with pavement surface for 30 years design life.
The Works included the Construction of two Dumbbell Interchanges,Relocation / Protection of existing services,
Extension of existing contingency ducts and construction of new contingency ducts. In addition to Utility
Networks (Construction of Lighting System, Construction of Storm Water Drainage, Construction of Road
Furniture) and all the ancillary works required to complete the works.
Scope
Supervision Consultancy Services
Location
Abu Dhabi – UAE
Period of assignment
Oct 2014
Client
MUSANADA