Project Description
CONSER carried out an assessment study of the side channel currently exists on Design and supervision services for the protection of Jabel Al Jais Road from scouring. The road is constructed on an embankment that reaches a height of 15m in some places. The design aimed at protecting and stopping, once and for all, the scouring of the embankment occurring every time it rains. The scope entailed conceptualising, designing and supervising, the protection measures adopted which was a series of ponds and dike placed strategically on the wadi bed.Scope
Design & Supervision Consultancy Services
Client
Ministry of Petroleum & Miniral Resources
Location
KSA
End of Assignment
2010