Improvement & Upgrading of The Intersection of Fujairah Khorfakkan Road & Yabsa – Fujairah Port Road

Project Description
M/s. MOEI contracted CONSER to conceptualise and design the Port of Fujairah Junction with E99 and Yabsa Bypass to alleviate the congestion being experienced by motorists at the junction which was affecting the main entrance of the Port of Fujairah. M/s. MOEI elected for the option of a 3×3 lanes Underpass with at grade signalized junction. The Underpass removed the through North/South movements from the junction and provided, with the Fujairah FOIZ Road widening (the E99) project, uninterrupted traffic flow all the way to the border of the Sharjah Emirate at Khorfakkan.

Scope

Design Consultancy Services

Client

Ministry Of Energy & Infrastructure (MOEI)

Location

Fujairah, UAE

End of Assignment

2023
CONSER, traces its origins back to 1969 where Mr. Azmi Haroun founded an office to address the burgeoning civil engineering demands of the nascent nation of the United Arab Emirates.

Contuct Us

Sheikh Zayed Road, Burj Al Salam (Office Tower) 1402
info@conser.ae
www.conser.ae
+971 4 282 4321
+971 4 282 5042