Dibba Massafi Road

There is an existing single carriageway, one lane in each direction, approximately 30 km in length which

connects Masafi to Dibba Cement Factory Junction. The existing road starts at the roundabout junction on the

Adh Dhayd to Fujairah dual carriageway road and ends at the existing roundabout junction on the Izn to Al

Tawaeen road. Upgrade of the existing road that was constructed in the late seventies and passes through

mountainous terrain for the first 15 km north of the Masafi Town and then through a level terrain up to Dibba.

The mountainous terrains existing along sections of the existing road are very steep, in some sections slopes

exceeds 12% and for long stretches of the road, which is restricting the use of the existing road by the heavily

laden trucks that are unable to climb such steep gradients.

The scope of Conser Services aims at upgrading the existing road to a dual carriageway connecting the town

of Masafi in the south to Dibba in the North. The road project forms part of an important primary road

connecting Dibba town and surrounding area to western Emirates, mainly Dubai, Sharjah, Umm Al

Qaiwain and Ras Al Khaimah, through Fujairah – Masafi road.

Scope

Design & Supervision Consultancy Services

Location

Fujairah, UAE

Client

Ministry of Infrastructure Development (MOEI)

Period of assignment

2010
CONSER, traces its origins back to 1969 where Mr. Azmi Haroun founded an office to address the burgeoning civil engineering demands of the nascent nation of the United Arab Emirates.

Contuct Us

Sheikh Zayed Road, Burj Al Salam (Office Tower) 1402
info@conser.ae
www.conser.ae
+971 4 282 4321
+971 4 282 5042