The contract comprises the design & supervision of new single carriage way from Al Ashkharah to Shanna in the south. The total length of the proposed road is 145 km divided into two sections. Section-1 about 60 km length and Section-2 about 85 km. The design work included the complete roadway design (horizontal and vertical alignments), road marking & signs, existing utilities protection and/or relocation and provisions for future lines). Also it included a comprehensive hydrology study of Wadis crossing.
Scope
Design and Supervision Consultancy Services
Client
Ministry of Transport and Communications – Oman
Location
Oman
Period of assignment
2002